Carson Street Before Construction: Part 2

2016-02-14 262

On Monday the 7th the groundbreaking ceremony was held for the Carson Street renovation project. The same day, utility work began to the north of downtown, with traffic reduced down to two lanes. This project is now officially underway, so our look at the street that is being torn out continues. Following on from the last post, this time we’ll look at the section between Second and Musser, in front of the Capitol Building.

Second to Musser

2016-02-14 192

2016-02-14 197 2016-02-14 227 2016-02-14 211 2016-02-14 205

2016-02-14 229 2016-02-14 240 2016-02-14 243 2016-02-14 601 2016-02-14 249 2016-02-14 285

2016-02-14 264 2016-02-14 276 2016-02-14 286 2016-02-14 304 2016-02-14 599 2016-02-14 295

Third Street

Another component of this project is the permanent abandonment of Third Street between Carson and Curry to build a public plaza. The street now is mostly used for parking for the shops and restaurants along here. That parking will have to move to the city lot on the other side of Curry. Some of the most dramatic differences in the whole project will be along this one block stretch.

2016-02-14 086 2016-02-14 114 2016-02-14 105 2016-02-14 107 2016-02-14 117 2016-02-14 119

2016-02-14 120 2016-02-14 121 2016-02-14 169 2016-02-14 130 2016-02-14 128

2016-02-14 133 2016-02-14 139 2016-02-14 143 2016-02-14 145 2016-02-14 152

Next time we will continue and look at Carson Street from Musser to Telegraph.